Tuesday, September 6, 2011

Disneyland Resort Fall Closures

Once again it is the off season and that means refurb time! The off-season is the time that a lot of refurbs happen and rides and areas close for refurbishments. Below is the schedule of refurbs for both parks:

Disneyland Park:

Pirates of the Caribbean: Sept 7th-November 23 for refurbishment. Expect Davy Jones to return to the ride. The Blue Bayou Restaurant will also be closed for the duration of the attractions refurb.

Indiana Jones Adventure: Sept 6th-7th for refurb

Haunted Mansion: Aug 29th-September 15th for installation of Haunted Mansion Holiday layover

Space Mountain: Sept 9th-15th to install Halloween overlay

Mark Twain: Sept 26-28 for refurbishment

Disneyland Monorail will not be completley closed but will run on a shortned schedule on weekdays for Buena Vista Street construction in California Adventure. Will operate normally on weekends.

Its a Small World: October 24th-November 10th to install Holiday overlay.

Disney California Adventure

California Screamin: September 6th- October 14th to replace loop and standard refurb.

Redwood Creek Challenge Trail: October 3rd-October 28 for refurb

Its Tough to Be a Bug!: October 24th-November 11th for refurb

You can see that a lot of the refurbs will be conducted this month and next. So keep these in mind if you plan to go to the parks soon.

Now I will show you the temp route for DCA:

 As you enter the gates, you will make a right.


 The Guest Relations Bungalow is next to Soarin.
Music slated to be for Buena Vista Street plays throughout the route.

 At 7pm, these gates will be open to ease traffic flow in this area. If you want to get to the tram or DtD, you go through the gates. If you need to return to Disneyland or need to go to Toy Story Shuttles, just make a right back to the temp route to exit through DCAs gates.
 The route gets you to Condor Flats


The path from Condor Flats to Hollywood Pictures Backlot remains with the walls now blocking Carthay Circle Theater, the pump house (not pictured) and the shops and bakery to the left. The performance corridor section from Condor Flats to Pacific Wharf has reopened.


This will be in effect till Buena Vista Streets Completion next year and it will open along with Cars Land next summer, ending the big project.

This concludes this Update!